logo

Natrium Plant Kemmerer Unit 1

Sector: Nuclear • Location: Kemmerer, Wyoming, United States

Source: TipRanks

Project
Under Construction

TerraPower has started full construction of its flagship Natrium plant, Kemmerer Unit 1 in Wyoming, which will be the first utility-scale advanced nuclear power plant in the United States. The plant features a 345 MW sodium-cooled fast reactor with a molten salt-based energy storage system capable of ramping output to 500 MW, providing dispatchable, baseload power with integrated storage for grid

Status
Under Construction
Sector
Nuclear, Power Generation (CCGT), Power Transmission, Energy Storage
Location
Kemmerer, Wyoming, United States of America
Updated
22 Jul 2026
Source
TipRanks

ConstructChat

Ask ConstructChat about Natrium Plant Kemmerer Unit 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Natrium Plant Kemmerer Unit 1” is an infrastructure initiative in the Nuclear sector, located in Kemmerer, Wyoming, United States. Taiyo aggregates data on it from TipRanks.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

TerraPower has started full construction of its flagship Natrium plant, Kemmerer Unit 1 in Wyoming, which will be the first utility-scale advanced nuclear power plant in the United States. The plant features a 345 MW sodium-cooled fast reactor with a molten salt-based energy storage system capable of ramping output to 500 MW, providing dispatchable, baseload power with integrated storage for grid flexibility.

Original sector

Energy

Location

Country

United States of America (USA)

State

Wyoming

City

Kemmerer

Source

Source

TipRanks

URL

More Details

Record type

Project

Sector

Nuclear, Power Generation (CCGT), Power Transmission, Energy Storage

Article published date

2026-04-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project