Natural Gas Pad & Pipeline
Sector: Water Supply and Storage • Location: Rifle, Colorado, United States of America
Source: Dodge
Drill 39 directionally drilled natural gas wells. The project includes about 12 acres of new surface disturbance plus pipelines for natural gas, produced water and condensate, with total surface disturbance expected to be about 53 acres.
- Status
- Prospective
- Sector
- Water Supply and Storage, Chemical (Industrial), Commercial, Manufacturing (Industrial), Natural Gas, Oil and Gas
- Location
- Rifle, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Natural Gas Pad & Pipeline
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Drill 39 directionally drilled natural gas wells. The project includes about 12 acres of new surface disturbance plus pipelines for natural gas, produced water and condensate, with total surface disturbance expected to be about 53 acres. |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Rifle |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Chemical (Industrial), Commercial, Manufacturing (Industrial), Natural Gas, Oil and Gas |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
