Natural Resources Management and Irrigation Development Project
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The main objective of the project is to develop and implement a soil and water management strategy. The latter would target irrigation development as a way to increase, diversity, and sustain agricultural output and exports. The first component, natural resource management, comprises: (i) pilot development schemes in micro-catchment areas of the Santa Lucia River Basin; (ii) demonstration farms in
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Government
- Location
- Uruguay
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Natural Resources Management and Irrigation Development Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objective of the project is to develop and implement a soil and water management strategy. The latter would target irrigation development as a way to increase, diversity, and sustain agricultural output and exports. The first component, natural resource management, comprises: (i) pilot development schemes in micro-catchment areas of the Santa Lucia River Basin; (ii) demonstration farms in selected agro-ecological areas suffering soil degradation and erosion problems; (iii) a geographical information system to provide the groundwork for improved land use classification and management; (iv) applied research and technology transfer activities focussed on modern techniques of soil and water management; (v) special studies; (vi) strengthening of policy planning, evaluation, and monitoring capacity at the level; and (vii) technical assistance for forestry development. The second component, irrigation development, comprises: (i) the rehabilitation and modernization of existing public irrigation and drainage (I&D) schemes; (ii) construction of new medium-size collective irrigation and drainage schemes for the benefit of user groups; (iii) construction of selected small farmer irrigation infrastructure; (iv) water harvesting pilot program at the farm level to help develop an optimal surface water use strategy; and (v) technical assistance for feasibility studies of irrigation investment projects, and for production, processing, and marketing of non-traditional export products. |
Original sector | FY17 - Agriculture, Fishing and Forestry,FY17 - Industry, Trade and Services,FY17 - Public Administration |
Budget |
Location
Country | Uruguay |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Uruguay
- Sociedad Anónima Molinos Arroceros Nacionales
- Botnia South America S.A.
- Hydrogen production to supply long-distance and heavy trucks
- Uruguay Water and Waste Systems Modernization Program Phase II
- Santa Lucía River Basin Water Treatment Plant
- Casupá Dam Construction
- Program to Support Policy Reform in Water Resources and Solid Waste II
- Second Program of Ciudad de la Costa
