Naudero-I Rental Power Project
Sector: Power Generation (CCGT) • Location: Pakistan
Source: World Bank Group
In June 2009, the 51 MW, gas-fired Naudero-I Rental Power Project reached financial closure. The Government of Pakistan (GoP) chose rental power projects as its major strategic tool for closing Pakistan’s electricity demand-supply gap in the short term.
Following its submission of an unsolicited proposal to the Private Power and Infrastructure Board (PPIB), Pakistan Power Resources (PPR) was awa
- Status
- Prospective
- Sector
- Power Generation (CCGT), Road, Solar, Natural Gas, Wind, Government
- Location
- Pakistan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Naudero-I Rental Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In June 2009, the 51 MW, gas-fired Naudero-I Rental Power Project reached financial closure. The Government of Pakistan (GoP) chose rental power projects as its major strategic tool for closing Pakistan’s electricity demand-supply gap in the short term. Following its submission of an unsolicited proposal to the Private Power and Infrastructure Board (PPIB), Pakistan Power Resources (PPR) was awarded the contract. PPR was a joint venture between Walters Power International [United States] (35%) and Associated Group [Pakistan] (65%). On June 4, 2009, PPR and the designated state-owned power purchaser, Central Power Generation Company (GENCO-II), signed the rental services contract (RSC). Under the RSC, GENCO-II was to pay a rental charge of US$91.7 million, payable in arrears in 60 equal monthly installments to the sponsor. In line with the GoP's procurment process for rental power projects, the project sponsor submitted a payment guarantee to GENCO-II equal to 7% of the RSC’s value. In return, GENCO-II made a down payment to the sponsor equal to 14% of the RSC’s value. Thereafter, the GoP issued an annual renewable sovereign guarantee covering GENCO-II’s rental payments. On June 30, 2009, Walters Power International announced that a pair of Rolls Royce RB211 turbines was en route to Pakistan and that the funding for the project had been completed. Walters issued a notice to proceed on the plant. The sponsor’s estimated investment was US$20.1 million. To calculate this estimate, first the investment's present value (PV) was assumed by multiplying an assumed investment per kilowatt (US$600) by the plant’s installed capacity. The PV was then used to find an annual amortized payment, assuming 15 years as the expected asset life and a discount rate of 10%. This annuity payment was then multiplied by the term of the rental contract in years, giving the sponsor’s total estimated investment. |
Original sector | Energy |
Budget |
Location
Country | Pakistan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road, Solar, Natural Gas, Wind, Government |
Article published date | 2024-09-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Pakistan
- Balloki CombinedCycle Power Project
- Ghazi Barotha RunofRiver Hydroelectric Project
- Karachi nuclear power plant KANUPP expansion
- Engro Thar Block II Power Plant Pakistan
- Bin Qasim Power Station 3 BQPSIII
- Engro Qadirpur NGCC Power Project
- Metro Wind Thatta District Onshore Wind Farm
- Matiari-Lahore Transmission Line