Naval Ave Bicycle & Pedestrian Enhancement
Sector: Automotive • Location: Bremerton, Washington, United States of America
Source: City of Bremerton
This corridor is located centrally to the City and serves a large number of single-family homes, businesses, military personnel, and a school. The project limits begin at the Puget Sound Naval Shipyard (PSNS Base), one of Kitsap County’s largest employers (24,000), and ends at a multifamily zoning. Naval Elementary School, general commercial, and neighborhood business districts are also adjacent
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | prospective |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This corridor is located centrally to the City and serves a large number of single-family homes, businesses, military personnel, and a school. The project limits begin at the Puget Sound Naval Shipyard (PSNS Base), one of Kitsap County’s largest employers (24,000), and ends at a multifamily zoning. Naval Elementary School, general commercial, and neighborhood business districts are also adjacent to Naval Avenue. The project includes pavement resurfacing, bike lanes, boxes and detection, wider sidewalks, signal timing and phasing, intersection treatments, curb bulbs, wayfinding signage, pavement markings, and modified storm drainage. Additional project work is a feasibility study of roundabouts at major intersection of Naval Avenue. Needs & Benefits Today, Naval Avenue is a 5-lane minor arterial (1st Street to 11th Street) that serves under 10,000 vehicles per day. This corridor section has deficient width sidewalks and various obstructions for ADA. The deficient sidewalk widths do not meet existing and forecasted higher pedestrian demand. There is not a comfort level for bicycles with vehicle speeds at 35 MPH and bicycles share the lanes with vehicles. After analysis and study, the City of Bremerton will use a road diet to provide enhancements to the corridor. Road diets offer us a cost-effective way to reduce traffic collisions, make walking and cycling safer, stimulate economic activity, and encourage residents to use alternative modes of transportation instead of driving. The successful use of road diets across the state demonstrates the efficacy of this approach. This is a way to enhance the quality of life in our community with this tool. Project Status In Design at 60% completion. City Council recently approved two actions for the project as of 6/15/2022. The first was a contract modification, with the design consultant, to include new design scope as well provide environmental permit assistance. This contract modification was in the amount of $148,593.45. The second action approved was the acceptance of a Transportation Alternatives Program Grant through PSRC in the amount of $1,850,000. This grant will be for the Right-Of-Way phase of the project which is slated to start in 2024. End Result This design project will produce a 100% level Design (ready for construction) that will reconfigure the corridor for a road diet providing bike lanes, wider sidewalks, and removal of ADA barriers. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
