logo

Naval Ave Bicycle & Pedestrian Enhancement

Sector: Automotive • Location: Bremerton, Washington, United States of America

Source: City of Bremerton

Project
Prospective

This corridor is located centrally to the City and serves a large number of single-family homes, businesses, military personnel, and a school. The project limits begin at the Puget Sound Naval Shipyard (PSNS Base), one of Kitsap County’s largest employers (24,000), and ends at a multifamily zoning. Naval Elementary School, general commercial, and neighborhood business districts are also adjacent

Project Information FAQ

Project Information

4 Q
The project “Naval Ave Bicycle & Pedestrian Enhancement” is an infrastructure initiative in the Automotive sector, located in Bremerton, Washington, United States of America. Taiyo aggregates data on it from City of Bremerton.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

prospective

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This corridor is located centrally to the City and serves a large number of single-family homes, businesses, military personnel, and a school. The project limits begin at the Puget Sound Naval Shipyard (PSNS Base), one of Kitsap County’s largest employers (24,000), and ends at a multifamily zoning. Naval Elementary School, general commercial, and neighborhood business districts are also adjacent to Naval Avenue. The project includes pavement resurfacing, bike lanes, boxes and detection, wider sidewalks, signal timing and phasing, intersection treatments, curb bulbs, wayfinding signage, pavement markings, and modified storm drainage. Additional project work is a feasibility study of roundabouts at major intersection of Naval Avenue. Needs & Benefits Today, Naval Avenue is a 5-lane minor arterial (1st Street to 11th Street) that serves under 10,000 vehicles per day. This corridor section has deficient width sidewalks and various obstructions for ADA. The deficient sidewalk widths do not meet existing and forecasted higher pedestrian demand. There is not a comfort level for bicycles with vehicle speeds at 35 MPH and bicycles share the lanes with vehicles. After analysis and study, the City of Bremerton will use a road diet to provide enhancements to the corridor. Road diets offer us a cost-effective way to reduce traffic collisions, make walking and cycling safer, stimulate economic activity, and encourage residents to use alternative modes of transportation instead of driving. The successful use of road diets across the state demonstrates the efficacy of this approach. This is a way to enhance the quality of life in our community with this tool. Project Status In Design at 60% completion. City Council recently approved two actions for the project as of 6/15/2022. The first was a contract modification, with the design consultant, to include new design scope as well provide environmental permit assistance. This contract modification was in the amount of $148,593.45. The second action approved was the acceptance of a Transportation Alternatives Program Grant through PSRC in the amount of $1,850,000. This grant will be for the Right-Of-Way phase of the project which is slated to start in 2024. End Result This design project will produce a 100% level Design (ready for construction) that will reconfigure the corridor for a road diet providing bike lanes, wider sidewalks, and removal of ADA barriers.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data