Naval Submarine Base Kings Bay Maitnce Drdg SOURCES SOUGHT
Sector: Water Supply and Storage • Location: Kings Bay, Georgia, United States of America
Source: Dodge USA
Work consists of secondary maintenance dredging. The locations and required depths are indicated in the table below and on the drawings. The placement of the dredged material will be at Disposal Area Crab Island (D/A-C) as indicated on the drawings and as directed by the Contracting Officer. Option B work also includes bird monitoring and standby time.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Seaport, Residential
- Location
- Kings Bay, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Naval Submarine Base Kings Bay Maitnce Drdg SOURCES SOUGHT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work consists of secondary maintenance dredging. The locations and required depths are indicated in the table below and on the drawings. The placement of the dredged material will be at Disposal Area Crab Island (D/A-C) as indicated on the drawings and as directed by the Contracting Officer. Option B work also includes bird monitoring and standby time. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Kings Bay |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Seaport, Residential |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
