Navarre Beach Causeway Emergency Repairs
Sector: Steel • Location: Navarre, Florida, United States of America
Source: Dodge USA
Work includes installation of approximately 328 LF of FRP sheet pile wall retaining system, including sheet pile, deadmen, and tiebacks, as well as various point repairs such as concrete cap repairs, tieback repair, and void repair. Base Bid will include 25 long steel tiebacks; Alt 1 will replace line item (7) 25 long steel tiebacks with line item (7a) 30 long stainless steel tiebacks.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Work includes installation of approximately 328 LF of FRP sheet pile wall retaining system, including sheet pile, deadmen, and tiebacks, as well as various point repairs such as concrete cap repairs, tieback repair, and void repair. Base Bid will include 25 long steel tiebacks; Alt 1 will replace line item (7) 25 long steel tiebacks with line item (7a) 30 long stainless steel tiebacks. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
