logo

Navigation on the Congo river and its tributaries the rivers Oubangui and Sangha

Sector: Commercial • Location: Congo, Republic of

Source: Programme for Infrastructure Development in Africa (PIDA)

Project
Active

The project aims to identify all the obstacles to navigate the Congo River, and the Oubangui and Sangha tributaries as well as the port infrastructure needs in order to improve the conditions and the capacity of safe river transport.

The Congo River is navigable for a distance of about 1700 km between Kinshasa and Kisangani. The Oubangui is navigable to Bangui from Liranga, which is 600 km from

Project Information FAQ

Project Information

5 Q
The project “Navigation on the Congo river and its tributaries the rivers Oubangui and Sangha” is an infrastructure initiative in the Commercial sector, located in Congo, Republic of. Taiyo aggregates data on it from Programme for Infrastructure Development in Africa (PIDA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project aims to identify all the obstacles to navigate the Congo River, and the Oubangui and Sangha tributaries as well as the port infrastructure needs in order to improve the conditions and the capacity of safe river transport. The Congo River is navigable for a distance of about 1700 km between Kinshasa and Kisangani. The Oubangui is navigable to Bangui from Liranga, which is 600 km from Brazzaville and the Sangha is navigable for a distance of roughly 710 km between Nola and the confluence with the Congo River. The project proposes sustainable solutions for the rehabilitation, development and operation of the river transport network. At the end of the feasibility study phase, the following developments are proposed for navigation and ports: Navigation: Improvement of the markup, the dredging of the main and secondary channel of the Congo River as well as the management of the difficult passes identified on Oubangui and Sangha. Ports: Dredging in front of wharves, salvaging wrecks, rehabilitating quay walls and quays, acquiring and repairing port operating equipment, rehabilitating buildings, warehouses and roads as well as the layout of certain existing berthing areas, etc. In addition, the project proposes skills development of the personnel of the institutions in charge of river transport of the three countries in the fields related to the code of inland navigation, the safety and security of navigation and port operations.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data