Navy Yard - Parcel O Mixed Use
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Selection of the developer was disclosed in a National Capital Planning Commission staff report. Redbrick imagines an animated riverfront courtyard, with outdoor dining, food trucks and other public spaces. That vision could include adaptively reusing what is known as Building 70, a historic former ship model testing facility, as food hall with architectural nods to other structures like Eastern M
- Status
- Prospective
- Sector
- Consumer Products, Hotel, Commercial, Residential, Seaport, Car parking, Automotive, Manufacturing (Industrial)
- Location
- Washington, District of Columbia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Navy Yard - Parcel O Mixed Use
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Selection of the developer was disclosed in a National Capital Planning Commission staff report. Redbrick imagines an animated riverfront courtyard, with outdoor dining, food trucks and other public spaces. That vision could include adaptively reusing what is known as Building 70, a historic former ship model testing facility, as food hall with architectural nods to other structures like Eastern Market. Other uses including multifamily , commercial space and hotel would be incorporated into t... |
Budget |
Location
Country | United States of America (USA) |
State | District of Columbia |
City | Washington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Hotel, Commercial, Residential, Seaport, Car parking, Automotive, Manufacturing (Industrial) |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
