logo
ProjectClosed

NBMCT Warehouse Building Renovation Phase 3

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

The Project consists of vertical building renovation work that generally includes building renovations, select renovation demolition, repairs and rehabilitation improvements, fire protection systems (fire alarm and fire sprinkler systems), electrical, plumbing, HVAC systems, office buildout, site/civil fire line service, optional exterior loading dock modifications and exterior building envelop im

Status
Closed
Sector
Warehouse, Manufacturing (Industrial), Residential, Power Generation (CCGT), Commercial
Location
New Bedford, Massachusetts, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about NBMCT Warehouse Building Renovation Phase 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “NBMCT Warehouse Building Renovation Phase 3” is an infrastructure initiative in the Warehouse sector, located in New Bedford, Massachusetts, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project consists of vertical building renovation work that generally includes building renovations, select renovation demolition, repairs and rehabilitation improvements, fire protection systems (fire alarm and fire sprinkler systems), electrical, plumbing, HVAC systems, office buildout, site/civil fire line service, optional exterior loading dock modifications and exterior building envelop improvements (foundations, exterior closure, windows/doors and roofing).

Procurement method

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

New Bedford

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Warehouse, Manufacturing (Industrial), Residential, Power Generation (CCGT), Commercial

Article published date

2025-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project