N.C. 184 Culvert Replacement Project
Planned · North Carolina · Last reported Jun 2026
Source: WataugaOnline.com
The N.C. Department of Transportation is preparing to replace a culvert damaged by Hurricane Helene that carries Hanging Rock Creek under N.C. 184. Temporary repairs were made to reopen the highway, and permanent repairs will begin later this year. Ahead of the culvert replacement, crews will relocate existing gas lines, which will require lane closures on N.C. 184 between Dobbins Road and Hickory
- Status
- Prospective
- Sector
- Transportation
- Location
- Banner Elk, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- WataugaOnline.com
ConstructChat
Ask ConstructChat about N.C. 184 Culvert Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The N.C. Department of Transportation is preparing to replace a culvert damaged by Hurricane Helene that carries Hanging Rock Creek under N.C. 184. Temporary repairs were made to reopen the highway, and permanent repairs will begin later this year. Ahead of the culvert replacement, crews will relocate existing gas lines, which will require lane closures on N.C. 184 between Dobbins Road and Hickory Nut Gap Road. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Banner Elk |
Source
Source | WataugaOnline.com |
URL |
More Details
Record type | Project |
Article published date | 2026-06-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
