NC-3 Pond Project
The owner, status and timeline of this project. A free account opens every field.
Source: Howard County (.gov)
The NC-3 pond project is designed to capture and hold stormwater on the New Cut branch of the watershed, with a capacity of 20.5 million gallons. It is currently in the final design phase.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government
- Location
- Ellicott City, Maryland, United States of America
- Updated
- 22 Jul 2026
- Source
- Howard County (.gov)
ConstructChat
Ask ConstructChat about NC-3 Pond Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The NC-3 pond project is designed to capture and hold stormwater on the New Cut branch of the watershed, with a capacity of 20.5 million gallons. It is currently in the final design phase. |
Original sector | Public Safety |
Location
Country | United States of America (USA) |
State | Maryland |
City | Ellicott City |
Source
Source | Howard County (.gov) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States
- Shaw Air Force Base
- Kings Bay Naval Submarine Base
- Beaumont Refinery Expansion, Texas
- Dakota Prairie Refinery, Stark County, North Dakota
- Monkey Island LNG Terminal, Louisiana
- Bayou Bridge Pipeline Project, Louisiana
- Texas LNG’s New Liquefied Natural Gas Facility, Brownsville, Texas
- Trunkline LNG Lake Charles Terminal, Louisiana
