NC/DOT : Division 10 Main Office Alterations
Sector: Manufacturing (Industrial) • Location: Albemarle, North Carolina, United States of America
Source: Dodge USA
The Work generally includes (but is not limited to) the construction of three (3) new Office Spaces within the existing Office Facility, including associated new Finishes, Mechanical/HVAC additions and modifications, and Electrical (Power & Lighting) additions and modifications. Designated adjacent Spaces affected by the three (3) new Office Spaces will also be included in receiving new Finishes.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Residential, Commercial, Telecommunications
- Location
- Albemarle, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about NC/DOT : Division 10 Main Office Alterations
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work generally includes (but is not limited to) the construction of three (3) new Office Spaces within the existing Office Facility, including associated new Finishes, Mechanical/HVAC additions and modifications, and Electrical (Power & Lighting) additions and modifications. Designated adjacent Spaces affected by the three (3) new Office Spaces will also be included in receiving new Finishes. New Data/Telecom. Work will consist of inwall Device Boxes, Conduits/Raceways, and Pull-Wire, to ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Albemarle |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Residential, Commercial, Telecommunications |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
