logo

NC/DOT: 184 (SHAWNEEHAW AVENUE) & NC 105

Sector: Bridge • Location: North Carolina, United States of America

Source: Dodge

Project
Closed

The scope of work for this project includes design, construction and management of the replacement of one bridge with a bridge. Construction shall include, but not be limited to, all necessary clearing, debris removal, within construction limits including the retrieval and disposal of all damaged bridge components, grading, roadway, drainage, structures, utility coordination and relocation, and er

Status
Closed
Sector
Bridge, Manufacturing (Industrial), Commercial, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT)
Location
North Carolina, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about NC/DOT: 184 (SHAWNEEHAW AVENUE) & NC 105

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “NC/DOT: 184 (SHAWNEEHAW AVENUE) & NC 105” is an infrastructure initiative in the Bridge sector, located in North Carolina, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The scope of work for this project includes design, construction and management of the replacement of one bridge with a bridge. Construction shall include, but not be limited to, all necessary clearing, debris removal, within construction limits including the retrieval and disposal of all damaged bridge components, grading, roadway, drainage, structures, utility coordination and relocation, and erosion and sediment control work items for the bridge replacement. The scope of work for this proj...

Procurement method

Budget

Location

Country

United States of America (USA)

State

North Carolina

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Bridge, Manufacturing (Industrial), Commercial, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT)

Article published date

2025-03-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project