NC/DOT: I-95 Widening and Lumber River bridges Replacement
Sector: Forest Products and Packaging • Location: Lumber Bridge, North Carolina, United States of America
Source: Dodge USA
Widening of I-95 from four to eight lanes, raising bridges and highway grade to mitigate flooding, and improving interchanges. The project includes replacing the Lumber River bridges with a single span 10 ft higher, rebuilding bridges at Exits 17, 19, and 20, and installing additional lanes along a 28-mile stretch from Lumberton to Hope Mills.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | planning schematics |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Widening of I-95 from four to eight lanes, raising bridges and highway grade to mitigate flooding, and improving interchanges. The project includes replacing the Lumber River bridges with a single span 10 ft higher, rebuilding bridges at Exits 17, 19, and 20, and installing additional lanes along a 28-mile stretch from Lumberton to Hope Mills. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
