NC/DOT: NC 71 Culvert Improvement
One of 10,000+ projects Taiyo tracks in North Carolina.
Source: Dodge USA
NC 71 at three culvert locations (770474 milepost 6.99 to 7.26, E2227 milepost 9.04 to 9.14, and 770475 milepost 9.35 to 9.45). Install guardrail at three culverts over the Jordan Swamp, Richland Swamp, and Long Swamp.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Mass Transit, Rail, Commercial
- Location
- North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about NC/DOT: NC 71 Culvert Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | NC 71 at three culvert locations (770474 milepost 6.99 to 7.26, E2227 milepost 9.04 to 9.14, and 770475 milepost 9.35 to 9.45). Install guardrail at three culverts over the Jordan Swamp, Richland Swamp, and Long Swamp. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Mass Transit, Rail, Commercial |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
