NC/DOT: NC-75 Sidewalk Construction
Planning schematics · North Carolina · Last reported Jul 2025
Source: Dodge
add right and left-turn lanes from Potter Road to NC 75, left-turn lanes from NC 75 to Potter Road, and concrete medians to control driveway access near the intersection to improve traffic operations and safety. This option will also add marked crosswalks and sidewalks to improve pedestrian connectivity and safety NC 75 AT POTTER ROAD INTERSECTION IN MINERAL SPRINGS. CONSTRUCT SIDEWALK AND PEDESTR
- Status
- Prospective
- Sector
- Road, Car parking, Automotive, Commercial, Cement
- Location
- Mineral Springs, North Carolina, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about NC/DOT: NC-75 Sidewalk Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | add right and left-turn lanes from Potter Road to NC 75, left-turn lanes from NC 75 to Potter Road, and concrete medians to control driveway access near the intersection to improve traffic operations and safety. This option will also add marked crosswalks and sidewalks to improve pedestrian connectivity and safety NC 75 AT POTTER ROAD INTERSECTION IN MINERAL SPRINGS. CONSTRUCT SIDEWALK AND PEDESTRIAN IMPROVEMENTS. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Mineral Springs |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Car parking, Automotive, Commercial, Cement |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
