logo
ProjectClosed

NC/DOT: Sidewalk Improvements

Sector: Car parking • Location: Asheville, North Carolina, United States of America

Source: Dodge USA

ASHEVILLE, BUNCOMBE COUNTY FROM NEW HAW CREEK ROAD, BEVERLYROAD TO BELL ROAD. CONSTRUCT SIDEWALKS. Construction Engineering and Inspection for EB-5944 Johnston Blvd. Sidewalk (18 month estimated construction timeframe) The Project generally consists of the construction of a new sidewalk and curb and gutter on Johnston Boulevard from Patton Avenue to Iona Circle. The specific work will include inst

Status
Closed
Sector
Car parking, Power Transmission, Road, Automotive, Commercial, Power Generation (CCGT)
Location
Asheville, North Carolina, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about NC/DOT: Sidewalk Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “NC/DOT: Sidewalk Improvements” is an infrastructure initiative in the Car parking sector, located in Asheville, North Carolina, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

ASHEVILLE, BUNCOMBE COUNTY FROM NEW HAW CREEK ROAD, BEVERLYROAD TO BELL ROAD. CONSTRUCT SIDEWALKS. Construction Engineering and Inspection for EB-5944 Johnston Blvd. Sidewalk (18 month estimated construction timeframe) The Project generally consists of the construction of a new sidewalk and curb and gutter on Johnston Boulevard from Patton Avenue to Iona Circle. The specific work will include installation of sidewalk, curb and gutter, driveway crossings and alterations, utility relocations, p...

Procurement method

Budget

Location

Country

United States of America (USA)

State

North Carolina

City

Asheville

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Car parking, Power Transmission, Road, Automotive, Commercial, Power Generation (CCGT)

Article published date

2024-04-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project