NC/DOT: Signing
Sector: Mass Transit • Location: Wendell, North Carolina, United States of America
Source: Dodge
This contract is for annual needs for signing, including LOGO signing, in Durham, Wake, and Franklin (I-87 only) Counties. This includes Type A and B (overhead and ground mounted) signs as well as D, E, and F signs, and LOGO signs.
- Status
- Closed
- Sector
- Mass Transit, Rail, Road, Commercial
- Location
- Wendell, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about NC/DOT: Signing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This contract is for annual needs for signing, including LOGO signing, in Durham, Wake, and Franklin (I-87 only) Counties. This includes Type A and B (overhead and ground mounted) signs as well as D, E, and F signs, and LOGO signs. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Wendell |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Rail, Road, Commercial |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in United States of America
- WMATA Orange and Blue Line Rehabilitation
- Dulles Metrorail Silver Line, Phase 2
- Broadway Substation Upgrades
- QLINE Streetcar Overhead Catenary System
- Blue Line Rail Power System Upgrades
- Congress Heights Station & Tunnel
- Navy Yard Metro West Entrance Modifications
- BART El Cerrito Del Norte Station Modernization Project
