NC/DOT: SR 1493 Intersection Improvements
Construction documents · North Carolina · Last reported Dec 2023
Source: Dodge USA
SS-6209V - SR 1493 (Frye Bridge Road) at SR 1520 (Friedburg Church Road) near Clemmons. Convert T-intersection into all-way stop. An all way stop project will require some radii widening, tree trimming and possibly solar powered flashers on stop ahead signs and stop signs on the SR 1493 eastbound
- Status
- Closed
- Sector
- Commercial, Bridge, Power Generation (CCGT), Solar, Road, Mass Transit, Rail
- Location
- Clemmons, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about NC/DOT: SR 1493 Intersection Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SS-6209V - SR 1493 (Frye Bridge Road) at SR 1520 (Friedburg Church Road) near Clemmons. Convert T-intersection into all-way stop. An all way stop project will require some radii widening, tree trimming and possibly solar powered flashers on stop ahead signs and stop signs on the SR 1493 eastbound |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Clemmons |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Bridge, Power Generation (CCGT), Solar, Road, Mass Transit, Rail |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
