logo
ProjectPlanning Schematics

NC/DOT: SR 1624 Multilane Widening

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The project will widen the roadway to a four-lane, median-divided section with curb and gutter, aesthetically enhanced medians, street lighting, pedestrian and bicycle facilities - construction will also include a 10-feet wide, street side trail on the south side of Carpenter Fire Station Road that will run the length of the project. Two new traffic signals, including pedestrian signals and crossw

Status
Prospective
Sector
Road, Commercial, Car parking, Automotive
Location
Cary, North Carolina, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about NC/DOT: SR 1624 Multilane Widening

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “NC/DOT: SR 1624 Multilane Widening” is an infrastructure initiative in the Road sector, located in Cary, North Carolina, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The project will widen the roadway to a four-lane, median-divided section with curb and gutter, aesthetically enhanced medians, street lighting, pedestrian and bicycle facilities - construction will also include a 10-feet wide, street side trail on the south side of Carpenter Fire Station Road that will run the length of the project. Two new traffic signals, including pedestrian signals and crosswalks at Cameron Pond Drive and Highcroft Drive, will also be noted on the plans. Also included in...

Procurement method

Budget

Location

Country

United States of America (USA)

State

North Carolina

City

Cary

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Commercial, Car parking, Automotive

Article published date

2024-11-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project