NC/DOT: SR 1624 Multilane Widening
Sector: Road • Location: Cary, North Carolina, United States of America
Source: Dodge USA
The project will widen the roadway to a four-lane, median-divided section with curb and gutter, aesthetically enhanced medians, street lighting, pedestrian and bicycle facilities - construction will also include a 10-feet wide, street side trail on the south side of Carpenter Fire Station Road that will run the length of the project. Two new traffic signals, including pedestrian signals and crossw
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Planning Schematics |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project will widen the roadway to a four-lane, median-divided section with curb and gutter, aesthetically enhanced medians, street lighting, pedestrian and bicycle facilities - construction will also include a 10-feet wide, street side trail on the south side of Carpenter Fire Station Road that will run the length of the project. Two new traffic signals, including pedestrian signals and crosswalks at Cameron Pond Drive and Highcroft Drive, will also be noted on the plans. Also included in... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Road projects in United States of America
- Bothell Everett Highway Overlay Project
- 102nd Ave NE Downtown Access Improvements
- Beardslee Blvd Widening
- 228th St SE Overlay (2nd Ave SE to 9th Ave SE) Project
- 2023 Citywide Pedestrian Safety Improvements Project
- NE 188th St Non-Motorized Improvements
- 2019-ADA Curb Ramps
- NE 185th St Utility Improvements Project
