NC/DOT: US 321 Intersection Improvements
Sector: Water Supply and Storage • Location: Hudson, North Carolina, United States of America
Source: Dodge
Widen 13.9 miles of U.S. 321 to a six-lane divided road - For most of the length, it would have a 30-foot raised grass median - The project is divided into four section: Section A U.S. 70 to U.S. 321A Section B U.S. 321A to Mission Road (currently unfunded) Section C Mission Road to Southwest Boulevard (currently unfunded) Section CA U.S. 321/Mount Herman Road intersection S 321 FROM SR 1160 (MOUN
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Planning Schematics |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Widen 13.9 miles of U.S. 321 to a six-lane divided road - For most of the length, it would have a 30-foot raised grass median - The project is divided into four section: Section A U.S. 70 to U.S. 321A Section B U.S. 321A to Mission Road (currently unfunded) Section C Mission Road to Southwest Boulevard (currently unfunded) Section CA U.S. 321/Mount Herman Road intersection S 321 FROM SR 1160 (MOUNT HERMAN ROAD) UPGRADE INTERSECTION TO SUPERSTREET DESIGN US 321 AT SR 1809/1952 (PINE MOUNTAIN R... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
