NC/DOT: US 421 Led Lighting Replacement
Sector: Commercial • Location: Winston-Salem, North Carolina, United States of America
Source: Dodge
US 421 (SALEM PARKWAY) FROM SILAS CREEK PARKWAY TO MARTIN LUTHER KING JR DRIVE. REPLACE EXISTING LIGHTING ON SALEM PARKWAY WITH LED LIGHTING.
- Status
- Prospective
- Sector
- Commercial, Road
- Location
- Winston-Salem, North Carolina, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about NC/DOT: US 421 Led Lighting Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | US 421 (SALEM PARKWAY) FROM SILAS CREEK PARKWAY TO MARTIN LUTHER KING JR DRIVE. REPLACE EXISTING LIGHTING ON SALEM PARKWAY WITH LED LIGHTING. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Winston-Salem |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Road |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
