ND/DOT: 409th Ave Structure Replacement (Job 23569)
One of 10,000+ projects Taiyo tracks in North Dakota.
Source: Dodge USA
0.0620 Miles Of Removal Of Structure, Precast Rcb Culvert, Grading, Aggregate Surfacing, & Incidentals Located 409Th Ave Ne, 7 Mi N Of Wilton & 7 Mi E Of Nd 41 And Involves Approximately: 1 L Sum Contract Bond; 1 L Sum Removal Of Structure; 28 Lf Removal Of Pipe All Types And Sizes; 488 Lf Remove Existing Fence; 1567 Cy Common Excavation-type B; 582 Cy Topsoil; 1 Ea Box Culvert Excavation; 525 Cy
- Status
- Closed
- Sector
- Water Supply and Storage, Cable car, Waste Processing and Treatment, Bridge, Road, Automotive, Commercial, Telecommunications
- Location
- Wing, North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about ND/DOT: 409th Ave Structure Replacement (Job 23569)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 0.0620 Miles Of Removal Of Structure, Precast Rcb Culvert, Grading, Aggregate Surfacing, & Incidentals Located 409Th Ave Ne, 7 Mi N Of Wilton & 7 Mi E Of Nd 41 And Involves Approximately: 1 L Sum Contract Bond; 1 L Sum Removal Of Structure; 28 Lf Removal Of Pipe All Types And Sizes; 488 Lf Remove Existing Fence; 1567 Cy Common Excavation-type B; 582 Cy Topsoil; 1 Ea Box Culvert Excavation; 525 Cy Foundation Fill; 1 Ea Foundation Preparation-box Culvert; 83 M Gal Water; .87 Acre Seeding Class ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Wing |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cable car, Waste Processing and Treatment, Bridge, Road, Automotive, Commercial, Telecommunications |
Article published date | 2023-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
