ND/DOT: CMC 0922 Structure Replacement (Job 23959)
Sector: Water Supply and Storage • Location: Amenia, North Dakota, United States of America
Source: Dodge USA
Proposed Work Consists Of 0.1320 Miles Of Structure Replacement And Structure Removal Located Cmc 0922, 1 Mi W Of Nd 18 (Amenia); 41St St Se, 7 Mi S Of Tower City And 2.5 Mi E Of Cmc 0901 And Involves Approximately: 1 L Sum Contract Bond; 1 L Sum Clearing & Grubbing; 1 L Sum Removal Of Structure-site 1; 1 L Sum Removal Of Structure-site 2; 747 Cy Common Excavation-type A; 497 Cy Topsoil; 950 Cy Bo
- Status
- Closed
- Sector
- Water Supply and Storage, Cable car, Road, Waste Processing and Treatment, Bridge, Mass Transit, Automotive, Rail, Commercial, Telecommunications
- Location
- Amenia, North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about ND/DOT: CMC 0922 Structure Replacement (Job 23959)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Proposed Work Consists Of 0.1320 Miles Of Structure Replacement And Structure Removal Located Cmc 0922, 1 Mi W Of Nd 18 (Amenia); 41St St Se, 7 Mi S Of Tower City And 2.5 Mi E Of Cmc 0901 And Involves Approximately: 1 L Sum Contract Bond; 1 L Sum Clearing & Grubbing; 1 L Sum Removal Of Structure-site 1; 1 L Sum Removal Of Structure-site 2; 747 Cy Common Excavation-type A; 497 Cy Topsoil; 950 Cy Borrow-excavation; 1 L Sum Class 1 Excavation; 1 L Sum Class 2 Excavation; 1 L Sum Channel Excavati... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Amenia |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cable car, Road, Waste Processing and Treatment, Bridge, Mass Transit, Automotive, Rail, Commercial, Telecommunications |
Article published date | 2024-04-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
