logo
ProjectClosed

ND/DOT: ND 46 Turn Lanes Improvements

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Proposed Work Consists Of 0.1510 Miles Of Turn Lane, Grading, Hma, Aggregate Base, And Incidentals Located Nd 46, Near Smith Ave Intersection (Enderlin) And Involves Approximately: 1 L Sum Contract Bond; 262 Ton Remove Aggregate Base & Surfacing; 439 Cy Topsoil; 239 Cy Borrow-excavation; 31 M Gal Water; .9 Acre Seeding Class Ii; .9 Acre Temporary Cover Crop; 1.8 Acre Straw Mulch; 140 Lf Fiber Roll

Status
Closed
Sector
Water Supply and Storage, Road, Commercial, Rail, Fertilizers, Raw Materials, Cable car, Mass Transit, Telecommunications, Automotive
Location
Kindred, North Dakota, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about ND/DOT: ND 46 Turn Lanes Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “ND/DOT: ND 46 Turn Lanes Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in Kindred, North Dakota, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Proposed Work Consists Of 0.1510 Miles Of Turn Lane, Grading, Hma, Aggregate Base, And Incidentals Located Nd 46, Near Smith Ave Intersection (Enderlin) And Involves Approximately: 1 L Sum Contract Bond; 262 Ton Remove Aggregate Base & Surfacing; 439 Cy Topsoil; 239 Cy Borrow-excavation; 31 M Gal Water; .9 Acre Seeding Class Ii; .9 Acre Temporary Cover Crop; 1.8 Acre Straw Mulch; 140 Lf Fiber Rolls 12In; 140 Lf Remove Fiber Rolls 12In; 1224 Ton Aggregate Base Course Cl 5; 236 Ton Superpave Fa...

Procurement method

Budget

Location

Country

United States of America (USA)

State

North Dakota

City

Kindred

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Commercial, Rail, Fertilizers, Raw Materials, Cable car, Mass Transit, Telecommunications, Automotive

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project