logo
ProjectClosed

ND/DOT: Structure Replacement

One of 10,000+ projects Taiyo tracks in North Dakota.

Source: Dodge USA

STRUCTURE REMOVAL AND STRUCTURE REPLACMENT 75TH ST NE, 7 MI W OF EDINBURG; 138TH AVE NE, 3 MI E AND 1 MI N OF PARK RIVER WALSH COUNTY Services of prequalified engineering firms to perform Construction Engineering on the following projects in Walsh County scheduled to be completed in 2025. BRJ-0050(058), PCN 23728; The project consists of the replacement of 2 existing structures and construction of

Status
Closed
Sector
Commercial, Bridge, Cement, Car parking, Automotive, Road
Location
Grafton, North Dakota, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about ND/DOT: Structure Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “ND/DOT: Structure Replacement” is an infrastructure initiative in the Commercial sector, located in Grafton, North Dakota, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

STRUCTURE REMOVAL AND STRUCTURE REPLACMENT 75TH ST NE, 7 MI W OF EDINBURG; 138TH AVE NE, 3 MI E AND 1 MI N OF PARK RIVER WALSH COUNTY Services of prequalified engineering firms to perform Construction Engineering on the following projects in Walsh County scheduled to be completed in 2025. BRJ-0050(058), PCN 23728; The project consists of the replacement of 2 existing structures and construction of a 115 ft. 2 span Prestressed Concrete Bridge and Box Culvert located in Walsh County, North Dakota

Procurement method

Budget

Location

Country

United States of America (USA)

State

North Dakota

City

Grafton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Bridge, Cement, Car parking, Automotive, Road

Article published date

2024-12-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project