Ndungu Full-Field Development at Block 15/06 West Hub
Sector: Oil and Gas • Location: Angola
Source: Social News XYZ
Development of the Ndungu field at Block 15/06 West Hub, featuring seven production wells and four injection wells, producing 60,000 barrels per day at peak capacity. The project includes migration of the Ndungu field from the Ngoma FPSO to the Agogo FPSO, followed by disconnection and decommissioning of Ngoma.
- Status
- Under Construction
- Sector
- Oil and Gas
- Location
- Angola
- Updated
- 22 Jul 2026
- Source
- Social News XYZ
ConstructChat
Ask ConstructChat about Ndungu Full-Field Development at Block 15/06 West Hub
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Development of the Ndungu field at Block 15/06 West Hub, featuring seven production wells and four injection wells, producing 60,000 barrels per day at peak capacity. The project includes migration of the Ndungu field from the Ngoma FPSO to the Agogo FPSO, followed by disconnection and decommissioning of Ngoma. |
Original sector | Energy |
Location
Country | Angola |
Source
Source | Social News XYZ |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2026-04-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
