logo

Ndungu Full-Field Development at Block 15/06 West Hub

Sector: Oil and Gas • Location: Angola

Source: Social News XYZ

Project
Under Construction

Development of the Ndungu field at Block 15/06 West Hub, featuring seven production wells and four injection wells, producing 60,000 barrels per day at peak capacity. The project includes migration of the Ndungu field from the Ngoma FPSO to the Agogo FPSO, followed by disconnection and decommissioning of Ngoma.

Status
Under Construction
Sector
Oil and Gas
Location
Angola
Updated
22 Jul 2026
Source
Social News XYZ

ConstructChat

Ask ConstructChat about Ndungu Full-Field Development at Block 15/06 West Hub

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Ndungu Full-Field Development at Block 15/06 West Hub” is an infrastructure initiative in the Oil and Gas sector, located in Angola. Taiyo aggregates data on it from Social News XYZ.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Development of the Ndungu field at Block 15/06 West Hub, featuring seven production wells and four injection wells, producing 60,000 barrels per day at peak capacity. The project includes migration of the Ndungu field from the Ngoma FPSO to the Agogo FPSO, followed by disconnection and decommissioning of Ngoma.

Original sector

Energy

Location

Country

Angola

Source

Source

Social News XYZ

URL

More Details

Record type

Project

Sector

Oil and Gas

Article published date

2026-04-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project