NDWWTP Effluent Pump Station Electrical Bldg Improvement
Sector: Commercial • Location: Sunny Isl Bch, Florida, United States of America
Source: Dodge USA
Scope of Work The scope of this Contract is building a new Electrical Annex Building that will house the new electrical and control equipment for the existing EPS building. The scope includes replacing all electrical switchgear, motor control centers, pump drives, load feeders and control re-routing that may be required. The scope also includes the replacement of the existing Effluent Pumps so tha
- Status
- Under Construction
- Sector
- Commercial, Power Generation (CCGT), Road, Waste Processing and Treatment, Government, Water Supply and Storage
- Location
- Sunny Isl Bch, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about NDWWTP Effluent Pump Station Electrical Bldg Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of Work The scope of this Contract is building a new Electrical Annex Building that will house the new electrical and control equipment for the existing EPS building. The scope includes replacing all electrical switchgear, motor control centers, pump drives, load feeders and control re-routing that may be required. The scope also includes the replacement of the existing Effluent Pumps so that a portion conveys secondary effluent to the new High Level Disinfection Treatment System and th... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Sunny Isl Bch |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Road, Waste Processing and Treatment, Government, Water Supply and Storage |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
