logo

N.E. POWER DISTRIBUT

Sector: Power Generation (CCGT) • Location: Brazil

Source: World Bank Group

Project
Closed

The project includes: (i) COELBA: installation of about 400 single circuit-km of 138 kV lines, 69 kV underground cable, 34.5 kV lines, 13.8 kV lines and of low-tension circuits; construction, expansion or improvement of four 138-69/13.8 kV substations providing an additional capacity of about 50 MVA, eight 69-34.5/13.8 kV substations providing an additional capacity of about 100 MVA, and two 34.15

Status
Closed
Sector
Power Generation (CCGT), Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about N.E. POWER DISTRIBUT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “N.E. POWER DISTRIBUT” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project includes: (i) COELBA: installation of about 400 single circuit-km of 138 kV lines, 69 kV underground cable, 34.5 kV lines, 13.8 kV lines and of low-tension circuits; construction, expansion or improvement of four 138-69/13.8 kV substations providing an additional capacity of about 50 MVA, eight 69-34.5/13.8 kV substations providing an additional capacity of about 100 MVA, and two 34.15/13.8 kV substations providing an additional capacity of about 10 MVA; and installation of about 123,700 meters and of control, protection and other equipment; (ii) CELPE: installation of single circuit-km of 69 kV lines, 13.8 kV lines and low-tension circuits; construction, expansion or improvement of twenty-six 69/13.8 kV substations providing an additional capacity of about 130 MVA; and installation of about 113,000 meters and of control, protection and other equipment; (iii) COELCE: installation of single circuit-km of 13.8 kV lines and low-tension circuits; construction of six 69/13.8 kV substations providing an additional capacity of about 140 MVA; and installation of about 72,700 meters and of control, protection, radio communication and other equipment; (iv) training, studies and technical assistance programs.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project