logo
ProjectPre-Design

Near Carillon Asphalt Fire Lane Replacement

One of 10,000+ projects Taiyo tracks in Illinois.

Source: Dodge USA

This project will replace the existing asphalt drive that connects the parking lot to the tower with the same grass covered reinforced geo-grid that was installed at Fredenhagen Park. In addition, the grass covered geo-grid will be extended east of the tower following the truck pathway to the Last Fling main stage. Engineering is programmed for 2026. Construction is programmed for 2027. The City o

Status
Prospective
Sector
Manufacturing (Industrial), Commercial, Car parking, Road, Government, Automotive
Location
Naperville, Illinois, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Near Carillon Asphalt Fire Lane Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Near Carillon Asphalt Fire Lane Replacement” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Naperville, Illinois, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

This project will replace the existing asphalt drive that connects the parking lot to the tower with the same grass covered reinforced geo-grid that was installed at Fredenhagen Park. In addition, the grass covered geo-grid will be extended east of the tower following the truck pathway to the Last Fling main stage. Engineering is programmed for 2026. Construction is programmed for 2027. The City of Naperville may be seeking a consultant to prepare a Near Carillon Asphalt Fire Lane Replacement...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Naperville

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Commercial, Car parking, Road, Government, Automotive

Article published date

2024-10-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project