NEB POWER VI
Closed · Malaysia
Source: World Bank Group
The project consists of: (1) construction and installation of about 132.5 miles of 275 kV lines and associated substations to link up the Temengor Hydroelectric Scheme with NEB's system at Papan and to extend the main system southward from Port Dickson to Malacca; (2) extension of associated transmission and distribution system under 275 kV; (3) establishment of control and load dispatching center
- Status
- Closed
- Sector
- Power Generation (CCGT), Raw Materials, Government
- Location
- Malaysia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about NEB POWER VI
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of: (1) construction and installation of about 132.5 miles of 275 kV lines and associated substations to link up the Temengor Hydroelectric Scheme with NEB's system at Papan and to extend the main system southward from Port Dickson to Malacca; (2) extension of associated transmission and distribution system under 275 kV; (3) establishment of control and load dispatching center; and (4) provision of consulting services. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Malaysia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project