logo

Nebraska Medicine Parking Lot 1 Improvements

Sector: Car parking • Location: United States of America (USA)

Source: Kiewit Construction

Project
Completed

Nebraska Medicine moved forward with a long-overdue renovation of the Orange Parking Structure (Lot 01) and the hospital front entrance. The renovation included a three-level parking structure, a drive-up patient and valet entrance; a helipad; doctor parking at grade level; and a waterproofed plaza system. Before the renovation could start, a new access entrance to the parking deck had to be const

Project Information FAQ

Project Information

5 Q
The project “Nebraska Medicine Parking Lot 1 Improvements” is an infrastructure initiative in the Car parking sector, located in United States of America (USA). Taiyo aggregates data on it from Kiewit Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Nebraska Medicine moved forward with a long-overdue renovation of the Orange Parking Structure (Lot 01) and the hospital front entrance. The renovation included a three-level parking structure, a drive-up patient and valet entrance; a helipad; doctor parking at grade level; and a waterproofed plaza system. Before the renovation could start, a new access entrance to the parking deck had to be constructed, and the flow of traffic re-mapped. While the plaza system was replaced at the main entry, a temporary patient drop-off canopy was erected and the side emergency door was used as the entry. To further accommodate the needs of patients and staff, a significant amount of the work was performed during off-business hours, and major demolition of the parking garage occurred at specified times. The scope of work included replacement of expansion joints, post-tension cable repairs, masonry repairs, application of traffic coatings, application of penetrating sealer, and painting of interior ceiling surfaces. The project was completed on budget and on time in less than six months, while never closing the garage and keeping the valet operational 24/7.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data