logo

NED Lopburi Solar Plant

Sector: Commercial • Location: Thailand

Source: World Bank Group

Project
Active

The Changwat power project is a 73MW solar photovoltaic (PV) project in Lopburi Province, Thailand. The project was designed to utlize over 540,000 high-grade, thin-film solar panels. The project was expected to be expanded to 84MW in June 2012. Annual output was estimated at 105 GWh.

Project company was the Natural Energy Development Co. Ltd. (33%), a company with sponsors CLP Holdings (HKG:0

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Solar, Government
Location
Thailand
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about NED Lopburi Solar Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “NED Lopburi Solar Plant” is an infrastructure initiative in the Commercial sector, located in Thailand. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Changwat power project is a 73MW solar photovoltaic (PV) project in Lopburi Province, Thailand. The project was designed to utlize over 540,000 high-grade, thin-film solar panels. The project was expected to be expanded to 84MW in June 2012. Annual output was estimated at 105 GWh. Project company was the Natural Energy Development Co. Ltd. (33%), a company with sponsors CLP Holdings (HKG:0002), Diamong Generating Asia (a subsidiary of Mitsubishi (TYO:8058)) (33%), and Electricity Generating Co (33%). All generated power was to be sold to the state-owned Electricity Generating Authority of Thailand (EGAT) under a 25-year power purchase agreement. Sharp Corp (TYO:6753) was to be the EPC contractor. The project was to become operational late 2012. The project eventually became operational mid-December 2011 in junst 18 months. Construction was done by Sharp (Japan), Ital-Thai Development, and Ital-Thai Engineering under an EPC contract. Construction started in August 2010. Total project cost was US$ 250 million. Financing comprised of THB3.48bn 12-year and 6 months syndicated term loan debt, THB1.9bn term loan and THB2.2bn of equity. Mandated arrangers for the syndicated facility are Kasikornbank, Bangkok Bank and Siam Commercial Bank. Financial close occured on 17 Jun 2010. The Asian Development Bank was also involved in the financing (Baht 2 billion/US$70 million). http://www.ned.co.th/news2010-10.html

Original sector

Energy

Budget

Location

Country

Thailand

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Solar, Government

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project