NE/DOT: Seward Maintenance Facility
Sector: Automotive • Location: Seward, Nebraska, United States of America
Source: Dodge USA
21,887 square foot pre-engineered metal building consisting of equipment bays, wash bays, offices, and breakroom for use as a maintenance facility for the State of Nebraska, Department of Transportation. Project involves civil, structural, architectural, plumbing, mechanical, and electrical trades.
- Status
- Closed
- Sector
- Automotive, Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial), Metal
- Location
- Seward, Nebraska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about NE/DOT: Seward Maintenance Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 21,887 square foot pre-engineered metal building consisting of equipment bays, wash bays, offices, and breakroom for use as a maintenance facility for the State of Nebraska, Department of Transportation. Project involves civil, structural, architectural, plumbing, mechanical, and electrical trades. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nebraska |
City | Seward |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial), Metal |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
