logo

Needs Study of a Community Owned Waste Water System Servicing a 17 home Sub-Division and Public Daycare

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

This is an engineering study which will assess the needs of a local peatland system which services a community owned housing development located in Stoneridge Circle in Osheweken, Ontario. The objective is to keep the effluent within Federal limits as per the Wastewater Systems Effluent Regulations and minimize environmental impacts to the Lake Erie Drainage Basin. This would meet the funds goals

Status
Closed
Sector
Water Supply and Storage, Government, Raw Materials, Residential, Waste Processing and Treatment
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Needs Study of a Community Owned Waste Water System Servicing a 17 home Sub-Division and Public Daycare

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Needs Study of a Community Owned Waste Water System Servicing a 17 home Sub-Division and Public Daycare” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This is an engineering study which will assess the needs of a local peatland system which services a community owned housing development located in Stoneridge Circle in Osheweken, Ontario. The objective is to keep the effluent within Federal limits as per the Wastewater Systems Effluent Regulations and minimize environmental impacts to the Lake Erie Drainage Basin. This would meet the funds goals of increasing the capacity or lifespan of the asset, enhancing service and improving environmental outcomes. Off reserve benefits: The improvement of our Six Nations waste water system’s discharge into the McKenzie Creek and eventually into the Grand River will assist with water treatment for those municipalities who draw our effluent water downstream from the Grand River for potable water usage as well as help make rivers and lakes healthier, which would have a positive impact on municipal agricultural users and have an overall positive environmental impact on the Lake Erie Drainage Basin as well as help to achieve the phosphorous load reduction targets for Lake Erie as our waste water effluent has been documented to have high phosphorus levels.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Raw Materials, Residential, Waste Processing and Treatment

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project