Neelmangla Tumkur Road Project
Sector: Commercial • Location: India
Source: World Bank Group
National Highways Authority of India (NHAI) awarded a 19 year concession to Jas Toll Road Company Limited (JRTCL) to build, finance, operate and maintain the Neelmangla Tumkur Road Project in the southern state of Karnataka. The project included four-laning of the existing two lane 32.5 km stretch on National Highway four (NH-4) between Neelmangla and Tumkur; construction of two railway over bridg
- Status
- Prospective
- Sector
- Commercial, Mass Transit, Bridge, Rail, Road, Tunnel, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Neelmangla Tumkur Road Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | National Highways Authority of India (NHAI) awarded a 19 year concession to Jas Toll Road Company Limited (JRTCL) to build, finance, operate and maintain the Neelmangla Tumkur Road Project in the southern state of Karnataka. The project included four-laning of the existing two lane 32.5 km stretch on National Highway four (NH-4) between Neelmangla and Tumkur; construction of two railway over bridges, 10 minor bridges, one flyover, five pedestrian subways, three under passes, and two toll plazas. The concession term included a construction period of two years. The concession agreement between NHAI and JRTCL was signed in July 2001. The Neelmangla Tumkur Road project was part of the Chennai-Mumbai section of the NHAI’s Golden Quadrilateral Program that linked the four major Indian cities of New Delhi, Mumbai, Chennai and Kolkata. This project was expected to ease traffic congestion, reduce travel time and give significant stimulus to trade and commerce in the entire region. Jas Toll Road Company Limited, a special purpose company wholly owned by India’s Abhijeet Group, was established exclusively to implement this project. Abhijeet Group won the project in an international competitive tender, conducted by NHAI, by bidding for the lowest grant of US$ 5.1 million. India’s highway development policy allowed ‘viability funding’ by NHAI to the tune of 40 percent of the capital costs as grant to the concessionaire, subject to competitive bidding. The total capital cost of the project was estimated at US$ 49.2 million. The project reached financial closure in June 2002. JRTCL was to be compensated for the capital and operating costs from the tolls collected during the concession term. Construction work on the project began in June 2002 and was completed in February 2004, four months ahead of schedule. http://www.sebi.gov.in/dp/jastolldraft.pdf |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Mass Transit, Bridge, Rail, Road, Tunnel, Government |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in India
- Mundra Ultra Mega Power Plant Gujarat
- ONGC Tripura Power Plant
- Salaya Power Project Gujarat
- Cable-stayed bridge project in the Chambal River
- Construction services for the wellness center component of NexusPark for the Columbus Regional Health and the City of Columbus in Indiana (United States)
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- Mytrah Energy Limited- 100.3MW Savalsang Windfarm
