Neelum Jhelum Hydropower Project
Sector: Tunnel • Location: Muzaffarabad, Pakistan
Source: Prag News
The Neelum Jhelum Hydropower Project (NJHP) is a 969-megawatt hydropower project near Muzaffarabad in Pakistan-occupied Kashmir. It began generating power in April 2018 but has been idle since July 2022 due to a blockage in its 68-kilometer-long tunnel infrastructure. Maintenance and repair work has been suspended due to lack of support from the Chinese contractor and local protests.
- Status
- Failure
- Sector
- Tunnel, Water Supply and Storage, Power Generation (CCGT), Hydro, Government
- Location
- Muzaffarabad, Pakistan
- Updated
- 22 Jul 2026
- Source
- Prag News
ConstructChat
Ask ConstructChat about Neelum Jhelum Hydropower Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | suspended |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Neelum Jhelum Hydropower Project (NJHP) is a 969-megawatt hydropower project near Muzaffarabad in Pakistan-occupied Kashmir. It began generating power in April 2018 but has been idle since July 2022 due to a blockage in its 68-kilometer-long tunnel infrastructure. Maintenance and repair work has been suspended due to lack of support from the Chinese contractor and local protests. |
Original sector | Energy |
Location
Country | Pakistan |
City | Muzaffarabad |
Source
Source | Prag News |
URL |
More Details
Record type | Project |
Sector | Tunnel, Water Supply and Storage, Power Generation (CCGT), Hydro, Government |
Article published date | 2025-06-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
