logo

Neelyville Wastewater System Improvements

Sector: Water Supply and Storage • Location: Neelyville, Missouri, United States of America

Source: Dodge USA

Project
Closed

Improvements to the existing wastewater infrastructure, including removal of sludge from lagoon cells 1, 2, and 3, security chain link fencing with access gate around the perimeter of the wastewater treatment facility, lagoon berm stabilization with rip-rap along the entire perimeter of lagoon cells 1 and 2, a new weather shelter for the UV disinfection system, a new diesel powered generator, and

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Commercial, Government, Car parking, Automotive
Location
Neelyville, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Neelyville Wastewater System Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Neelyville Wastewater System Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in Neelyville, Missouri, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Improvements to the existing wastewater infrastructure, including removal of sludge from lagoon cells 1, 2, and 3, security chain link fencing with access gate around the perimeter of the wastewater treatment facility, lagoon berm stabilization with rip-rap along the entire perimeter of lagoon cells 1 and 2, a new weather shelter for the UV disinfection system, a new diesel powered generator, and replacement of one duplex grinder pump station.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Neelyville

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Commercial, Government, Car parking, Automotive

Article published date

2024-10-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project