Nelson Meadows Business Park Lot 4 Block 3
Sector: Water Supply and Storage • Location: Bozeman, Montana, United States of America
Source: Dodge
Three industrial warehouse/office buildings totaling 36,098 square feet and associated parking and utility work on the 2.59 acre site - Lot 4, Block 3 of the Nelson Meadows Subdivision (J-680) Section 22, T1S, R5E - Each building ranges between 11,946 sf to 12,186 sf and include an accessory office and mezzanine on the upper floor. This development application includes associated parking, loading
- Status
- Failure
- Sector
- Water Supply and Storage, Warehouse, Car parking, Commercial, Residential, Power Transmission, Automotive, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Bozeman, Montana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Nelson Meadows Business Park Lot 4 Block 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Three industrial warehouse/office buildings totaling 36,098 square feet and associated parking and utility work on the 2.59 acre site - Lot 4, Block 3 of the Nelson Meadows Subdivision (J-680) Section 22, T1S, R5E - Each building ranges between 11,946 sf to 12,186 sf and include an accessory office and mezzanine on the upper floor. This development application includes associated parking, loading docks, pedestrian pathways, open space, stormwater infrastructure, landscaping, irrigation, and l... |
Budget |
Location
Country | United States of America (USA) |
State | Montana |
City | Bozeman |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Warehouse, Car parking, Commercial, Residential, Power Transmission, Automotive, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
