Nenskra Hydropower Project

Sector: Road • Location: Georgia

Source: International Finance Corporation (IFC)

Project
Hold

The Nenskra HPP is a high-head 210MW hydropower project on the Nenskra River in the Svaneti District of NW Georgia. The project was initially conceived in 2009 and 2010 through various visits to the project area culminating in a Pre-Feasibility Study produced

in March 2010, and a detailed Feasibility Study produced in May 2011 by Swiss Engineering consulting firm Stucky. The preliminary env

Project Information FAQ

Project Information

5 Q
The project “Nenskra Hydropower Project” is an infrastructure initiative in the Road sector, located in Georgia. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

hold

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Nenskra HPP is a high-head 210MW hydropower project on the Nenskra River in the Svaneti District of NW Georgia. The project was initially conceived in 2009 and 2010 through various visits to the project area culminating in a Pre-Feasibility Study produced in March 2010, and a detailed Feasibility Study produced in May 2011 by Swiss Engineering consulting firm Stucky. The preliminary environmental studies were carried out during the feasibility study. The main project components are expected to comprise a 135m high, asphalt-core rockfill dam on the upper Nenskra river creating a live storage of about 182million m3. The dam will capture the flows of the Nenskra River and the adjacent Nakra river upstream of the existing Khudoni HPP reservoir, exploiting the available head of 725m. The Nakra River is connected to the main scheme through a 4.5m diameter free-flow tunnel of 12.4km. The power waterway comprises a segmental lined headrace tunnel of 15.1km, 4.5 m diameter, pressure shaft and penstock totaling 1580m. The surface powerhouse is located on the left side of the river and houses 3x70MW pelton units. A 5yr construction schedule has been elaborated for completing the project. The project should be capable of providing a total / firm energy generation of 1194/927GWh/y, 264 GWh of guaranteed full supply in the three winter months. The total investment is expected to be ~450Mio USD.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data