logo

Neo Power Project

Sector: Power Generation (CCGT) • Location: United States

Source: The Globe and Mail

Project
Commercialized

Neo is a behind-the-meter power innovation project with 682 megawatts of installed capacity, a 12.5-year contract, and an expected in-service date in the second half of 2028. It represents an investment of approximately $2.3 billion and targets a 5x build multiple.

Status
Prospective
Sector
Power Generation (CCGT)
Location
United States of America
Updated
22 Jul 2026
Source
The Globe and Mail

ConstructChat

Ask ConstructChat about Neo Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Neo Power Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in United States. Taiyo aggregates data on it from The Globe and Mail.

Participants

Not available for this record.

Status

Original status

commercialized

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Neo is a behind-the-meter power innovation project with 682 megawatts of installed capacity, a 12.5-year contract, and an expected in-service date in the second half of 2028. It represents an investment of approximately $2.3 billion and targets a 5x build multiple.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

Source

Source

The Globe and Mail

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2026-05-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project