logo

NEOM Green Hydrogen Project

Sector: Hydrogen • Location: NEOM, Saudi Arabia

Source: Fuel Cells Works

Project
Under Construction

The NEOM Green Hydrogen project in Saudi Arabia is preparing to begin commercial production of green hydrogen in 2027, following testing and commissioning phases scheduled for 2026. The project is a joint venture between ACWA Power, Air Products, and NEOM, located in Oxagon, the industrial city within the wider NEOM project. It consists of three primary sites: the hydrogen plant in Oxagon, a solar

Status
Under Construction
Sector
Hydrogen, Power Generation (CCGT), Solar, Manufacturing (Industrial), Wind, Commercial
Location
NEOM, Saudi Arabia
Updated
22 Jul 2026
Source
Fuel Cells Works

ConstructChat

Ask ConstructChat about NEOM Green Hydrogen Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “NEOM Green Hydrogen Project” is an infrastructure initiative in the Hydrogen sector, located in NEOM, Saudi Arabia. Taiyo aggregates data on it from Fuel Cells Works.

Participants

Company

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The NEOM Green Hydrogen project in Saudi Arabia is preparing to begin commercial production of green hydrogen in 2027, following testing and commissioning phases scheduled for 2026. The project is a joint venture between ACWA Power, Air Products, and NEOM, located in Oxagon, the industrial city within the wider NEOM project. It consists of three primary sites: the hydrogen plant in Oxagon, a solar field about 80 kilometers to the east, and a wind turbine site about 120 kilometers to the north. The project will generate a total of 4 gigawatts of power for the hydrogen plant by the end of 2026, with commercial operations starting in 2027. The plant will produce 600 tons of hydrogen a day, converted into 1.2 million tons of ammonia annually, shipped through a dedicated port with a purpose-built berth. Construction began about two years ago and is over 80% complete. The project supports Saudi Arabia's Vision 2030 goals for clean energy and economic diversification.

Original sector

Energy

Location

Country

Saudi Arabia

City

NEOM

Source

Source

Fuel Cells Works

URL

More Details

Record type

Project

Sector

Hydrogen, Power Generation (CCGT), Solar, Manufacturing (Industrial), Wind, Commercial

Article published date

2025-11-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project