NEOM Green Hydrogen Project
Sector: Energy Storage • Location: Saudi Arabia
Source: Crude Oil Prices Today | OilPrice.com
The NEOM green hydrogen project is expected to become the largest utility-scale commercially based hydrogen facility powered by renewable energy in the world. The $8.4 billion project will include 3.9 GW of green power from solar, wind, and battery energy storage systems (BESS) and is expected to produce 600 tonnes per day of clean hydrogen once operational. The government aims to power the entire
- Status
- Prospective
- Sector
- Energy Storage, Power Transmission, Oil and Gas, Hydrogen, Solar, Government, Power Generation (CCGT), Wind
- Location
- Saudi Arabia
- Updated
- 22 Jul 2026
- Source
- Crude Oil Prices Today | OilPrice.com
ConstructChat
Ask ConstructChat about NEOM Green Hydrogen Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The NEOM green hydrogen project is expected to become the largest utility-scale commercially based hydrogen facility powered by renewable energy in the world. The $8.4 billion project will include 3.9 GW of green power from solar, wind, and battery energy storage systems (BESS) and is expected to produce 600 tonnes per day of clean hydrogen once operational. The government aims to power the entire NEOM mega-project using a variety of renewable energies. |
Original sector | Energy |
Budget |
Location
Country | Saudi Arabia |
Source
Source | Crude Oil Prices Today | OilPrice.com |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Transmission, Oil and Gas, Hydrogen, Solar, Government, Power Generation (CCGT), Wind |
Article published date | 2025-11-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in Saudi Arabia
- Ras Tanura Refinery Expansion
- توريد و تركيب مستلزمات استديو التصوير التليفزيوني
- Battery Energy Storage System Projects in Tabuk and Hail
- Amaala Luxury Resort Off-Grid Renewable Facility
- Al Baitha Bauxite Mine 8 MW Solar Power Project
- AlUla Tram Project
- 18 GWh BESS Factory
- Saudi Arabia-Bahrain 2.8GW Solar PV Plant with Co-located BESS
