Neom Green Hydrogen Project
Sector: Power Generation (CCGT) • Location: Neom, Saudi Arabia
Source: Energy Connects
The world's largest green hydrogen project located in Saudi Arabia's Neom, intended to produce green hydrogen for export as green ammonia and local consumption. The project aims to use power from 4 gigawatts of renewable plants and produce up to 600 tons of green hydrogen per day.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Hydrogen
- Location
- Neom, Saudi Arabia
- Updated
- 22 Jul 2026
- Source
- Energy Connects
ConstructChat
Ask ConstructChat about Neom Green Hydrogen Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The world's largest green hydrogen project located in Saudi Arabia's Neom, intended to produce green hydrogen for export as green ammonia and local consumption. The project aims to use power from 4 gigawatts of renewable plants and produce up to 600 tons of green hydrogen per day. |
Original sector | Energy |
Budget |
Location
Country | Saudi Arabia |
City | Neom |
Source
Source | Energy Connects |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Hydrogen |
Article published date | 2025-05-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
