NEPAL GRID DEVELOPMENT PROGRAMME
The status, timeline and source of this project. A free account opens every field.
Source: European Investment Bank (EIB)
This project comprises the construction of transmission infrastructure, comprising a 26.5 km long 220 kV overhead transmission line from Chilime to Trishuli and 2 new substations, that are required to evacuate electricity from newly-constructed hydropower plants in the Trishuli River basin into the national grid, as well as a rural electrification component to supply power to communities in the vi
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT), Government, Education
- Location
- Nepal
- Updated
- 19 Nov 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about NEPAL GRID DEVELOPMENT PROGRAMME
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | financed |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This project comprises the construction of transmission infrastructure, comprising a 26.5 km long 220 kV overhead transmission line from Chilime to Trishuli and 2 new substations, that are required to evacuate electricity from newly-constructed hydropower plants in the Trishuli River basin into the national grid, as well as a rural electrification component to supply power to communities in the vicinity of the project areas. The project also includes an upgrade of the national Load Dispatch Cent |
Original sector | Energy |
Budget |
Location
Country | Nepal |
Source
Source reliability | High |
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Government, Education |
Article published date | 2023-05-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
