NEPAL GRID DEVELOPMENT PROGRAMME
Signed · Nepal
Source: European Investment Bank (EIB)
This project comprises the construction of high voltage transmission infrastructure required to evacuate electricity from newly-constructed hydropower plants in the Trishuli River basin into the national grid, as well as a rural electrification component to supply power to communities in the vicinity of the project areas. The project also includes an upgrade of the national Load Dispatch Centre (L
- Status
- Under Construction
- Sector
- Hydro, Power Transmission, Power Generation (CCGT), Government
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about NEPAL GRID DEVELOPMENT PROGRAMME
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project comprises the construction of high voltage transmission infrastructure required to evacuate electricity from newly-constructed hydropower plants in the Trishuli River basin into the national grid, as well as a rural electrification component to supply power to communities in the vicinity of the project areas. The project also includes an upgrade of the national Load Dispatch Centre (LDC). |
Original sector | Energy |
Location
Country | Nepal |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Transmission, Power Generation (CCGT), Government |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
