Nepal: Tamakoshi V Hydroelectric Project (TV-HEP)

Sector: Water Supply and Storage • Location: Nepal

Source: Asian Infrastructure Investment Bank (AIIB)

Project
Proposed

The project comprises four components listed below. Component One-Civil and Hydromechanical Works: comprising the construction of the project's hydraulic structures, all of which will be underground, and the installation of hydromechanical equipment. Component Two-Electromechanical, Transmission Line, and Infrastructure Works, comprising the installation of electromechanical equipment and the cons

Project Information FAQ

Project Information

5 Q
The project “Nepal: Tamakoshi V Hydroelectric Project (TV-HEP)” is an infrastructure initiative in the Water Supply and Storage sector, located in Nepal. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

proposed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project comprises four components listed below. Component One-Civil and Hydromechanical Works: comprising the construction of the project's hydraulic structures, all of which will be underground, and the installation of hydromechanical equipment. Component Two-Electromechanical, Transmission Line, and Infrastructure Works, comprising the installation of electromechanical equipment and the construction of a small loop of double-circuit lines to existing transmission lines, permanent and temporary workers' camps and access roads within the project site. Component Three-Implementation of Environmental and Social Management Plans (ESMPs): including activities for resettlement compensation and livelihood restoration, monitoring of the catchment in terms of flows, watershed and sediment for optimal operation of the Project and an early warning system for the communities. Component Four-Construction Supervision, Implementation Support, Technical Assistance and Monitoring and Evaluation of the Project Impacts and ESMP: The GoN has requested  a grant from the Bank's Project Preparation Special Fund (PSF) to support the additional preparation required by the Bank's policies, including additional technical reviews and environmental and social studies. These activities will be implemented by the NEA.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data