ProjectProposed

Nepal: Tamakoshi V Hydroelectric Project (TV-HEP)

Sector: Water Supply and Storage • Location: Nepal

Source: Asian Infrastructure Investment Bank (AIIB)

The project comprises four components listed below. Component One-Civil and Hydromechanical Works: comprising the construction of the project's hydraulic structures, all of which will be underground, and the installation of hydromechanical equipment. Component Two-Electromechanical, Transmission Line, and Infrastructure Works, comprising the installation of electromechanical equipment and the cons

Status
Prospective
Sector
Water Supply and Storage, Government, Hydro, Manufacturing (Industrial), Road, Power Generation (CCGT)
Location
Nepal
Updated
22 Jul 2026
Source
Asian Infrastructure Investment Bank (AIIB)

ConstructChat

Ask ConstructChat about Nepal: Tamakoshi V Hydroelectric Project (TV-HEP)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Nepal: Tamakoshi V Hydroelectric Project (TV-HEP)” is an infrastructure initiative in the Water Supply and Storage sector, located in Nepal. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Participants

Sponsoring Agency

Company

Status

Original status

proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project comprises four components listed below. Component One-Civil and Hydromechanical Works: comprising the construction of the project's hydraulic structures, all of which will be underground, and the installation of hydromechanical equipment. Component Two-Electromechanical, Transmission Line, and Infrastructure Works, comprising the installation of electromechanical equipment and the construction of a small loop of double-circuit lines to existing transmission lines, permanent and temporary workers' camps and access roads within the project site. Component Three-Implementation of Environmental and Social Management Plans (ESMPs): including activities for resettlement compensation and livelihood restoration, monitoring of the catchment in terms of flows, watershed and sediment for optimal operation of the Project and an early warning system for the communities. Component Four-Construction Supervision, Implementation Support, Technical Assistance and Monitoring and Evaluation of the Project Impacts and ESMP: The GoN has requested  a grant from the Bank's Project Preparation Special Fund (PSF) to support the additional preparation required by the Bank's policies, including additional technical reviews and environmental and social studies. These activities will be implemented by the NEA.

Original sector

Energy

Budget

Location

Country

Nepal

Source

Source

Asian Infrastructure Investment Bank (AIIB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Hydro, Manufacturing (Industrial), Road, Power Generation (CCGT)

Article published date

2024-10-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project