NERGS-III Siang Basin Transmission Project
Sector: Hydro • Location: Arunachal Pradesh, India
Source: Power Peak Digest
Interstate transmission system project to evacuate power from the Heo and Tato I hydropower projects in Arunachal Pradesh. The project was transferred to Dineshchandra R Agrawal Infracon Private Limited (DRAIPL) and has an estimated cost of Rs 1,804 crore with commissioning targeted by February 2029.
- Status
- Under Construction
- Sector
- Hydro, Power Generation (CCGT)
- Location
- Arunachal Pradesh, India
- Updated
- 22 Jul 2026
- Source
- Power Peak Digest
ConstructChat
Ask ConstructChat about NERGS-III Siang Basin Transmission Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Interstate transmission system project to evacuate power from the Heo and Tato I hydropower projects in Arunachal Pradesh. The project was transferred to Dineshchandra R Agrawal Infracon Private Limited (DRAIPL) and has an estimated cost of Rs 1,804 crore with commissioning targeted by February 2029. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Arunachal Pradesh |
Source
Source | Power Peak Digest |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT) |
Article published date | 2026-05-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
