logo
ProjectClosed

NERP Long Term-Contract IQC

One of 10,000+ projects Taiyo tracks in Alberta.

Source: Dodge USA

This Contract shall include excavation, curb, gutter and sidewalk reconstruction, curb ramp installation, granular base, asphaltic concrete paving, new catch basin installation, catch basin adjustment, water valve adjustment, installation of new subdrain system, surface milling, landscaping. Duration of the contract is 24 months.

Status
Closed
Sector
Commercial, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Government, Automotive, Manufacturing (Industrial)
Location
Edmonton, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about NERP Long Term-Contract IQC

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “NERP Long Term-Contract IQC” is an infrastructure initiative in the Commercial sector, located in Edmonton, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This Contract shall include excavation, curb, gutter and sidewalk reconstruction, curb ramp installation, granular base, asphaltic concrete paving, new catch basin installation, catch basin adjustment, water valve adjustment, installation of new subdrain system, surface milling, landscaping. Duration of the contract is 24 months.

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Edmonton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Government, Automotive, Manufacturing (Industrial)

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project